Which of the measures involved in “three-point” time estimations express how long you hope the task will take, assuming everything goes as planned?

Q: Which of the measures involved in “three-point” time estimations express how long you hope the task will take, assuming everything goes as planned?

  • Most likely time estimates   
  • Milestone time estimates   
  • Optimistic time estimates   
  • Planning time estimates 